Hoyer Chemical Container Storage Terminal

Category
Manufacturing & Industrial
About This Project

Owner: HOYER

Designer: NNP

Paving Contractor: Rollcon

Paving Machine: Volvo 8020

Mixing Plant: Rapid 400C

General Contractor: Rollcon

Completion Date: 6/8/23

 

Project Details:

For this project, Rollcon provided a design-build RCC pavement solution to the client that would provide new life and safer working conditions for the heavily trafficked container storage facility.  By utilizing RCC the client was able to continue its operation during the construction period and was quickly handed over a finished product that was ready for heavy traffic. This project consisted of 357,724 SF total of RCC and 102,318 SF of 16” RCC, 169,376 SF of 12” RCC and 81,780 SF of 10” RCC.

The Scope of work included demolition and recycling of 28,000 tons of existing failed asphalt paving and subgrade. The subgrade prep was 379,024 SF 12” of 6% lime & 6% Cement stabilization. For existing utilities, the work consisted of repairing/replacing failed site drainage and adding additional drainage systems to prevent future environmental issues by isolating potentially hazardous spill area drainage.