ABOUT THIS PROJECT
Owner:
Cedrico Lumber
Paving Contractor:
Bellemare
Paving Machine:
Vogele 2100-3i
Mixing Plant:
Rapidmix 400
General Contractor:
Bellemare
Completion Date:
RCC – Phase I in 2018, Phase II in 2020, Phase III in 2022
Bellemare carried out work on 2 different sites for Cedrico, in 3 different phases. In all, more than 700,000 square feet were paved by Bellemare in Gaspésie, Quebec. The pavement structure was optimized for cost-effectiveness, and the RCC varied in thickness from 8 to 12 inches. A major challenge in this project was the paving of a forest access road with a 14% slope for nearly half a mile.