Air Capitol Drive

Category
Streets & Roadways
About This Project

PROJECT NAME

Air Capitol Drive

OWNER

City of Park City Kansas

DESIGNER

PEC

PAVING CONTRACTOR

Andale Construction, Inc.

PAVING MACHINE

2 Volvo 8820

MIXING PLANT

Twin Shaft Central Mix

GENERAL CONTRACTOR

Andale Construction, Inc.

COMPLETION DATE

11/2023

 

Project Summary:

In 2023, Andale Construction, Inc. worked on the Air Capitol Drive project. Andale placed 101,600 square feet of nine-inch roller compacted concrete pavement over six inches of aggregate base and 4,600 linear feet of curb and gutter for the City of Park City in Kansas.  PEC designed the project with Andale acting as both the paving and general contractor.    Andale used a Volvo-ABG 8820 high density paving machine and twin shaft central mixing plant.   The owner selected RCC due to the cost and time savings, superior durability, and life cycle expectations.  The project was completed in November of 2023.